Prep work is now starting with the walls and ceiling in the master bedroom. This means removing the old plaster ceiling roses, insulation boards fitted to outside walls for extra warmth and protection against the elements. All skirting boards and radiators removed. The skirting will be replaced with some of the boards salvaged from elsewhere in the apartment. The largest wall is adjacent to the next apartment so this has been double boarded with acoustic plasterboard and insulated. The two staff beads on the corners of the chimney breast have been uncovered. We have sanded these back to the wood ❤️ although they will get a new coat of paint. The arch above the floor to ceiling window was not in great condition so this has also been repointed. All ready for a fresh coat of plaster throughout.






❤️